Jump to content

Reducing stock part component creation time for R&D and allowing multiple-item queueing with a button


Arzion

Recommended Posts

Posted

Stock parts are somewhat smaller items supposed to be built in bulk that are used to upgrade the machineries of the station. The 10-second waiting time for an un-upgraded protolathe fabrication for each stock part is tedious and unnecessarily long. It should be reduced to at most 2 seconds and at least 1 second.


Speaking about stock parts, however, to add value to their in-bulk construction, there should be buttons akin to the tg-station-derived fabrication menus, that allow queue-ing 10 instances of the same type with just a button.

Posted

Reducing part creation time should be a function of improved protolathe/circuit imprinter parts, if it isn't already.

I think that given the existence of a queue system multiple parts per click are unnecessary and would clog the interface. Maybe add the queue list in a frame to the side instead of having it in a separate screen entirely? The exosuit fabricator gets that done nicely.

  • 2 months later...
Guest
This topic is now closed to further replies.
×
×
  • Create New...