Jump to content

[CLOSED] Incident Report - 05/08/2548 - Engineering Department


Recommended Posts

Posted

Reporting Personnel: Niko Schnitz

Rank of Reporting Personnel: Cargo Technician

Personnel Involved:

- Ikrad Yam'hir, Chief Engineer: Offender

- Samara Kaytam, Engineering Apprentice: Offender

- Bob Springston, Engineering Apprentice: Witness/Offender

- Aaliyah Kha'jur, Atmospheric Technician; Witness/Offender

- Manfred Hayden, Engine Technician: Witness/Offender

- Multiple other crewmembers at various times are witnesses.

Time of Incident: 3 PM, ongoing through shift.

Real time: Shift start at 1540 05/08/2016

Location of Incident: Engineering Lobby/Engineering Breakroom

Nature of Incident: [x]Workplace Hazard []Accident/Injury []Destruction of Property [x]Neglect of Duty []Harassment []Assault [x]Misconduct []Other _____

Overview of the Incident: From fairly near the start of the shift, estimated half an hour or so in, the Chief engineer came to cargo to request a jukebox, and this was accepted and paid by him. However, concerns were raised when it turned out he, and the rest of the engineering staff, were 'renovating' engineering through the use of their given materials, modifying it to an environment not meant for a workplace. Further concern was raised through the fact that the staff were charging other crew for entry to the area, as well as attempting to acquisition an alcohol dispenser for their personal use. It all seems to be a huge waste of resources that could be better used, as well as possible breaks of regulations and contract on multiple peoples. Also, there was apparently a room filled with superheated phoron, which is a massive safety risk to the crew.



Did you report it to a Head of Staff or IAA? If so, who?: Samuel Hatheway, Head of Personnel.

-

Additional notes: They were charging 20 credits for entry, less for synthetics.


Below are several pictures taken from camera footage:

Front Desk, where payments were made, manned by the chief engineer Ikrad Yam'hir: https://gyazo.com/cfcceb11f846498435b2510293929941

The main room: With multiple crewmembers, those being: Ashley Treanor; Jack Mitchell; Jack Sutton; Ash LaCroix; Bob Springston; Samara Kaytam; Manfred Hayden; Aaliyuh Kha'jur; GRADI: https://gyazo.com/cdeff49b958d799f74c9f7cf43d41a4a

The Phoron 'Fireplace': https://gyazo.com/1f4af6c2c0c4f07469cdb371d0525f34

Posted

TO: Niko Schnitz, Cargo Technician, NSS Exodus

FROM: Ruslan Gregorovich, CCIAA, NMSS Odin

SUBJECT: Re: Incident Report

--------------------

BODY:

The issue was already handled via faxes with the Head of Personnel. The Chief Engineer was talked to about pocketing money for station resources, and the constructions were found to be acceptable due to our trust in the professionalism of our engineering staff and the proper station modification paperwork being reportedly filed. This report will be closed.

--------------------

DTG: 05-00:28-TAU CETI STANDARD-08-2458

SIGN: Ruslan Gregorovich

Guest
This topic is now closed to further replies.
×
×
  • Create New...